G/BA commissioned the direct digital control (DDC) system for all six projects which included 155,000 square feet of building additions with 29 new air handlers, 18 new chillers and 8 new diesel generators and totalled 3,700 control points. G/BA was also the mechanical, electrical and controls design engineer on all six projects,