G/BA Logo

Ingalls Memorial Hospital

Harvey, Illinois



Boiler Plant Upgrade

The existing boilers and associated equipment were old and in poor condition. This project replaced the old equipment, increased capacity and redundancy and lowered energy and operating costs. The project has reduced natural gas costs by $400,000 per year and has significantly reduced water consumption.


2007 ASHRAE Excellence in Engineering Chapter Award